5 1 1 1 1 1 1 1 1 1 1 (1 Vote)

Company logoDesign and build for new office lot at Star Parc Point, Setapak Kuala Lumpur for Rakyatnews.my

Project scope: Interior design and build for new office lot at Star Parc Point, Setapak, KL

Size: New office corner lot 2600SF

Capacity: Office room, meeting room, surau, pantry, ceiling, flooring, electrical, builtin furniture and loose furniture

Duration: 4weeks

Business Type: Online Media/News company klpos, rakyat news

Design Drawings:

iso layout

layout plan

electrical & celing plan

Filing cabinet

GM room cabinet

meeting room cabinet

workstation

workstation bench

Renovation progress photos:

empty lot before renovation

empty lot before renovation

office lot before renovation

Office lot before renovation.

2' x 2' suspended ceiling frame

installing ceiling frame

Installing of 2' x 2' suspended ceiling frame.

 installing partition

installing gypsum board partition

Installing of gypsum board partition

electrical trunking

installing of electrical trunking

Installing of electrical trunking.

wiring

wiring

wiring

Electrical wiring.

installing aluminium glass partition

install aluminium frame

Install aluminium frame for glass partition.

install plaster ceiling

plaster ceiling

Installing of plaster ceiling and opening for air-cond.

 installing of glass door closer

door closer

Instaling of tempered glass door and closer.

painting

painting

Painting ceiling and partition with selected Nippon paint.

install glass door

install glass panel

Install tempered glass door and glass panel to aluminium frame.

install MS pole

MS pole at main entrance with curve shape.

cutting ms pole

install ms pole

Installing of MS pole to main entrance.

install ceiling cassette aircond 

Install cassette type air-cond.

MS pole at man entrance

ms pole at entrance

MS pole at main entrance.

GM room with glass partition

GM room with aluminium glass partition.

laying carpet tile

install carpet tiles

laying carpet tiles

Laying carpet tiles.

 laying glass frosted film

laying frosted glass film

Laying frosted glass film.

laying laminate floor

laying laminate floor

Laying laminate floor to pantry room and prayer room (surau).

carpet tiles

carpet tiles

Carpet tiles at general working area and room.

installing of builtin cabinet

builtin cabinet

Installing of built-in cabinet.

table stand

table stand

Table stand with powder coating at factory.

filing cabinet

pantry cabinet

MD room cabinet

builtin cabinet

copier cabinet

Installing built-in cabinet.

install roller bliind

install roller blind

Install roller blind.

table stand

table stand

Install workstation table stand.

install workstation

install table top

Installing of workstation table top and office chairs.

wiring at workstation

cable tray

Install wiring, power, network and phone socket to workstation.

glass sliding door

Glass sliding door to cover the main DB.

glass panel to meeting room

Install glass writing panel to meeting room cabinet.

install signage at main entrance

Install company signage at main entrance.

Completion photos:

main entrance

Main entrance, waiting area.

MD room seating area

MD room seating area.

meeting room

Meeting room

general working area

general workstation

Genral working area.

studio room

Studio room with tall filing cabinet and working bench.

discussion area

discussion

Discussion area.

pantry

Pantry

GM table

GM desk.

waiting area

Waiting area.

Complete set of project album you can refer here or follow us at Google+ or Facebook.

Submit to DeliciousSubmit to DiggSubmit to FacebookSubmit to Google PlusSubmit to StumbleuponSubmit to TechnoratiSubmit to TwitterSubmit to LinkedIn
9 * 4 =
or Cancel
Thomas Cheah 2019-May-23 02:05:46
Do you reno for condo? Request on painting, skirting, cornice with wiring, wall design mirror and probably room partition.
editor

Popular items