Design Drawings:








Renovation progress photos:



Office lot before renovation.


Installing of 2' x 2' suspended ceiling frame.


Installing of gypsum board partition


Installing of electrical trunking.



Electrical wiring.


Install aluminium frame for glass partition.


Installing of plaster ceiling and opening for air-cond.


Instaling of tempered glass door and closer.


Painting ceiling and partition with selected Nippon paint.


Install tempered glass door and glass panel to aluminium frame.

MS pole at main entrance with curve shape.


Installing of MS pole to main entrance.
Install cassette type air-cond.


MS pole at main entrance.

GM room with aluminium glass partition.



Laying carpet tiles.


Laying frosted glass film.


Laying laminate floor to pantry room and prayer room (surau).


Carpet tiles at general working area and room.


Installing of built-in cabinet.


Table stand with powder coating at factory.





Installing built-in cabinet.


Install roller blind.


Install workstation table stand.


Installing of workstation table top and office chairs.


Install wiring, power, network and phone socket to workstation.

Glass sliding door to cover the main DB.

Install glass writing panel to meeting room cabinet.

Install company signage at main entrance.
Completion photos:

Main entrance, waiting area.

MD room seating area.

Meeting room


Genral working area.

Studio room with tall filing cabinet and working bench.


Discussion area.

Pantry

GM desk.

Waiting area.